Online Encyclopedia Search Tool

Your Online Encyclopedia

 

Online Encylopedia and Dictionary Research Site

Online Encyclopedia Free Search Online Encyclopedia Search    Online Encyclopedia Browse    welcome to our free dictionary for your research of every kind

Online Encyclopedia



Upholder class submarine

The Upholder-class submarines ( now known as Victoria class) were diesel-electric hunter-killer (SSK) submarines designed in the late 1970s to supplement the Royal Navy's nuclear submarine force. That force was intended to comprise 18 nuclear-powered attack boats (SSNs) and four ballistic missile boats (SSBNs), but construction of the SSNs fell behind schedule, and the construction plans were altered to include ten modern SSKs as well. The price of each was intended to be about one-third that of one of the SSNs, and was finally published at US$215 million, but actual cost after correcting the design flaws was higher. After all four subs were sold to the Canadian navy, the Canadian forces renamed them as the Victoria class.

The design included an updated version of the fire-control system being installed on the SSNs under construction at the same time, a state-of-the-art French passive sonar system, the then-current towed array, and a micro-puffs passive ranging set.

A large double-armature motor was powered by a 9000-amp-hour battery or a pair of Paxman Valenta diesel engines. Slow patroling would require only 30 to 60 minutes of snorkling per day; an eight-knot transit would require snorkling some 30% of the time. Top speed matched any comparable SSK class and could be sustained for some 90 minutes.

However, the design did contain flaws. It was highly automated to reduce manning, and the weapon-discharge system that controlled the operations of the torpedo tubes could, under certain conditions, open the torpedo tube slide valve while the rear door was open. Had such an event actually occurred, unrestricted flooding would have resulted.

Miscalculations were made in the design of the main motor. During sea trials of the lead ship of the class, it was noticed that an emergency reversal ("crash back") would generate currents of more than 60,000 amps, which resulted in catastrophic and spectacular complete loss of propulsion.

The diesels were originally designed for use in railway locomotives, and were not intended to be rapidly stopped and started. Shutting them down after snorkling led to many failures. Similarly, the motor-generators were operated a full power for longer than expected, and consumed brushes and filters rapidly.

Acceptance of the class into service was delayed for three years while such problems were corrected. The result of those corrections, however, was an extremely capable design. When operating on battery, Upholders were almost undetectable on passive sonar, and when snorkling, their acoustic signature was comparable to their SSN contemporaries in normal operation. They were physically small, and thus difficult to detect by magnetic anomaly or other non-acoustic means.

A local area network was built into the Upholders, supporting most of the sensors and fire-control systems, including remote viewing through the periscopes using both low-light television and infrared, an unmanned helm, and direct control of the main motor from the conn. The boat could fight with a team of four in the sound room and a conn team of eight. Fire-suppression in unmanned compartments could be initiated remotely, and watch-keeping logs were automatically recorded. In port, the boats could be electronically linked such that one duty watchstander could monitor several submarines.

In 1993, HM Government decided to halt construction with only four boats launched, and furthermore to decommission the four in service in favour of a rationalisation of the submarine fleet to nuclear only. In 2002, Canada accepted the four Upholders as replacements for their old O-class submarines. One will operate in the Pacific fleet, three in the Atlantic.

There have been arguments over the quality of the submarines with some suggestions that the purchase price of £244m will be at least spent again putting things right. Canadian opposition parties are demanding that the British government fund any further costs, however it cost the Royal Navy £900m to build the submarines and even if there are some minor problems Stephen Saunders, editor of Jane's Fighting Ships, argues that "there is not something inherently wrong with the class of submarines." On Tuesday October 5 2004 HMCS Chicoutimi, sailing from Faslane, Scotland to Nova Scotia declared an emergency north-west of Ireland following a fire onboard. The submarine lost power and was rescued by the Royal Navy frigates HMS Montrose and HMS Marlborough on October 6. This episode will further complicate the issue of the sale of the submarines.

Ships in Class

General Characteristics

  • Displacement: 2200 tons surfaced, 2400 tons submerged
  • Length: 70.3 m
  • Beam: 7.2 m
  • Height: 7.6 m
  • Engines: two Paxman Valenta 16 RPA diesel generators, 4,070 hp (3,035 kW)
  • Motor-Generators: two GEC, 5,000 kW
  • Speed: 12 knots surfaced, 20+ knots submerged
  • Armament: six 21 in (533 mm) torpedo tubes, 24 torpedoes
  • Range: 10,000 nautical miles (18,500 km) at 12 knots (22 km/h)
  • Complement: seven officers, 40 men


Upholder-class submarine

Upholder | Unseen | Ursula | Unicorn


List of submarines of the Royal Navy
List of submarine classes of the Royal Navy


Last updated: 11-03-2004 21:25:23